Data Center Directory

Data center in Smithville

Data center in Smithville is an operational data center in Smithville, United States. Our footprint estimate of its power is about 26 MW.

Key facts

StatusOperational
Facility power26 MW (range 13 MW to 41 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 21,495 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.31639, -94.57733

Power and grid

Nearest high-voltage substationUnnamed substation, 345 kV, 1.6 km away (Evergy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
UtilityPlatte-Clay Electric Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityAECI
Nearest gas pipelineSouthern Star Central Gas PL Co, interstate pipeline, 17.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.1 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity674 g CO₂ per kWh (Missouri, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7%
Industrial power priceUSD 0.099 per kWh (Missouri, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.3 °C (2001 to 2025)
Cooling degree days736 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayLow - Medium (10-20%) (Missouri)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Smithville use?

We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.

How close is Data center in Smithville to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 1.6 km away. The local utility is Platte-Clay Electric Coop, INC, in the AECI balancing area.

How clean is the power for Data center in Smithville?

The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.

Data centers near Smithville

Sources

Correct this page or get the data