Data center in Umeki is an operational data center in Umeki, Japan. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 743 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.62766, 130.33458 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low (<10%) (Kagoshima) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Umeki use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Umeki?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Data centers near Umeki
- NTT 18.6 km · 1.4 MW
- NTT 18.9 km · 1.4 MW
- NTT 20.9 km · 0.8 MW
- NTT 21.7 km · 29 MW
- Next-MIC DataCenter 21.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.