Data center in Umeki is an operational data center in Umeki, Japan. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 743 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates31.62766, 130.33458

Power and grid

Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Water stress todayLow (<10%) (Kagoshima)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Umeki use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Umeki?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Data centers near Umeki

Sources

Correct this page or get the data