Next-MIC DataCenter
Next-MIC DataCenter is an operational data center operated by 南日本情報処理センター in Kagoshima, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | 南日本情報処理センター |
| Coordinates | 31.53456, 130.53561 |
| Website | kk-mic.jp/it_service/products/all/dc/index.html |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low (<10%) (Kagoshima) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Next-MIC DataCenter?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Next-MIC DataCenter?
南日本情報処理センター.
Data centers near Kagoshima
- NTT 2.1 km · 0.8 MW
- NTT 3.5 km · 1.4 MW
- NTT 6.2 km · 29 MW
- NTT 9.0 km · 1.4 MW
- Data center in Umeki 21.7 km · 0.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.