NTT
NTT is an operational data center operated by NTT Global Data Centers in Kagoshima, Japan. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 1.4 MW (range 0.7 MW to 2.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,135 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.56259, 130.51850 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low (<10%) (Kagoshima) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How clean is the power for NTT?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT?
NTT Global Data Centers.
Data centers near Kagoshima
- Next-MIC DataCenter 3.5 km
- NTT 4.4 km · 0.8 MW
- NTT 4.6 km · 29 MW
- NTT 6.0 km · 1.4 MW
- Data center in Umeki 18.9 km · 0.9 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.