Data Center (Ministério Público de Minas Gerais)

Data Center (Ministério Público de Minas Gerais) is an operational data center in Belo Horizonte, Brazil. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
Facility power0.9 MW (range 0.5 MW to 1.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 760 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-19.92903, -43.97863

Power and grid

Nearest high-voltage substationSubestação Gutierrez, 138 kV, 2.1 km away (Cemig)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação Barreiro, 345 kV, 8 km away
HV substations within 10 km16
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature20.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.7 °C (2001 to 2025)
Cooling degree days1,000 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.02 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow (<10%) (Minas Gerais)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data Center (Ministério Público de Minas Gerais) use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is Data Center (Ministério Público de Minas Gerais) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Gutierrez (138 kV), about 2.1 km away.

How clean is the power for Data Center (Ministério Público de Minas Gerais)?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Data centers near Belo Horizonte