Datacenter Base-Telenet is an operational data center operated by Telenet in Aartselaar, Belgium. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorTelenet
Facility power1.4 MW (range 0.7 MW to 2.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,164 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.14363, 4.37844

Power and grid

Nearest high-voltage substationSchelle Dorp, 150 kV, 3.5 km away (Elia)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMercator, 380 kV, 9.3 km away
HV substations within 10 km10
Power plants within 50 km6.9 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity151 g CO₂ per kWh (Belgium, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1%
Industrial power priceEUR 0.133 per kWh (Belgium, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.6 °C (2001 to 2025)
Cooling degree days87 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.03 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayExtremely High (>80%) (Belgium)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter Base-Telenet use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is Datacenter Base-Telenet to the power grid?

The nearest high-voltage substation in OpenStreetMap is Schelle Dorp (150 kV), about 3.5 km away.

How clean is the power for Datacenter Base-Telenet?

The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.

Who operates Datacenter Base-Telenet?

Telenet.

Data centers near Aartselaar

More Telenet data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.