DC Mechelen
DC Mechelen is an operational data center operated by Datacenter United in Mechelen, Belgium. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Datacenter United |
| Address | Stationsstraat 58 |
| Coordinates | 51.01696, 4.48043 |
| Website | datacenterunited.com/datacenters/dc-mechelen |
Power and grid
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for DC Mechelen?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates DC Mechelen?
Datacenter United.
Data centers near Mechelen
- Keyes Datacenter 1.2 km · 25 MW
- Telenet servergebouw 2.2 km · 1.5 MW
- Proximus Netcenter 2 12.3 km · 10 MW
- Datahouse Belgium 13.1 km
- Belgacom Netcenter - 02MRI 13.1 km
- KevlinX Brussels 13.5 km · 8.8 MW
- LCL Brussels (Diegem) 14.5 km
- MCI/Verizon Brussels (Diegem) E 14.8 km
More Datacenter United data centers
- DC Moeskroen Belgium
- brusselsdc Belgium
- antwerpdc Belgium
- DC Evere Belgium
- dcvlaanderen Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.