Telenet servergebouw
Telenet servergebouw is an operational data center operated by Telenet in Mechelen, Belgium. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telenet |
| Facility power | 1.5 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,220 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.03605, 4.48541 |
Power and grid
| Nearest high-voltage substation | 150kV Mechelen, 150 kV, 1.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lint, 380 kV, 9.2 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 5.3 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telenet servergebouw use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How close is Telenet servergebouw to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150kV Mechelen (150 kV), about 1.3 km away.
How clean is the power for Telenet servergebouw?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Telenet servergebouw?
Telenet.
Data centers near Mechelen
- Keyes Datacenter 2.1 km · 25 MW
- DC Mechelen 2.2 km
- Datacenter Base-Telenet 14.1 km · 1.4 MW
- Proximus Netcenter 2 14.5 km · 10 MW
- Datahouse Belgium 15.1 km
- Belgacom Netcenter - 02MRI 15.2 km
- KevlinX Brussels 15.6 km · 8.8 MW
- LCL Brussels (Diegem) 16.7 km
More Telenet data centers
- Datacenter Base-Telenet Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.