Datacenter Mutualisé Lorrain

Datacenter Mutualisé Lorrain is an operational data center operated by CNRS in Vandœuvre-lès-Nancy, France. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorCNRS
Facility power12 MW (range 5.9 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,461 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.65597, 6.15056

Power and grid

Nearest high-voltage substationPoste électrique de Neuves Maisons, 400 kV, 5.8 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km1.4 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.2 °C (2001 to 2025)
Cooling degree days159 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.28 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayMedium - High (20-40%) (Grand Est)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter Mutualisé Lorrain use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Datacenter Mutualisé Lorrain to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Neuves Maisons (400 kV), about 5.8 km away.

How clean is the power for Datacenter Mutualisé Lorrain?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Datacenter Mutualisé Lorrain?

CNRS.