Neo Center Est is an operational data center in Woippy, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 49.14830, 6.17628 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Saint-Julien, 225 kV, 2.6 km away (réséda) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 7.1 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 154 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.15 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Grand Est) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Neo Center Est to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Saint-Julien (225 kV), about 2.6 km away.
How clean is the power for Neo Center Est?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Woippy
- Advanced Mediomatrix 8.3 km · 13 MW
- Advanced MedioMatrix 8.5 km
- Association ReptiGo 14.6 km
- DATA4 Luxembourg - LUX 39.9 km · 7.6 MW
- LuxConnect DC1.1 - Bettembourg 39.9 km · 13 MW
- DEEP Resilience Centre Luxembourg South 40.0 km · 12 MW
- Inexio 46.1 km · 5.3 MW
- Portus LUX1 48.2 km
Sources
Correct this page or get the data