Datacenter TIM-Google
Datacenter TIM-Google is an operational data center operated by TIM - Google in Trofarello, Italy. Our footprint estimate of its power is about 11 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | TIM - Google |
| Facility power | 11 MW (range 5.4 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,016 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2022 |
| Coordinates | 44.97585, 7.72476 |
Power and grid
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 292 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.72 kWh per m² per day |
| Wind at 50 m | 2.9 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter TIM-Google use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
What chips does Datacenter TIM-Google use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Datacenter TIM-Google?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Datacenter TIM-Google?
TIM - Google.
Data centers near Trofarello
- CSI Piemonte 9.0 km
- Data center in Circoiscrizione III 11.6 km · 3.2 MW
- Data center in San Donato 12.8 km
- COLT Datacenter Turin 13.2 km
- ITGate PdF (TRN1/TRN2) 13.7 km
- Retelit S.p.A. Torino 13.8 km
- BBBell Torino 13.8 km
- Noovle DC Rivoli 16.7 km · 8.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.