Data Center Directory

Datacenter

Datacenter is an operational data center operated by SOCIETE TECHNOLOGIE EXPLOITATION INFORMATIQUE in Voisins-le-Bretonneux, France. Our footprint estimate of its power is about 5.5 MW.

Key facts

StatusOperational
OperatorSOCIETE TECHNOLOGIE EXPLOITATION INFORMATIQUE
Facility power5.5 MW (range 2.7 MW to 8.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,546 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvenue Joseph Kessel 148
Coordinates48.76548, 2.05709

Power and grid

Nearest high-voltage substationPoste électrique Saules, 225 kV, 2.8 km away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km1.8 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days106 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter use?

We estimate the facility power at about 5.5 MW. Estimate from building footprint, low confidence.

How close is Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique Saules (225 kV), about 2.8 km away.

How clean is the power for Datacenter?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Datacenter?

SOCIETE TECHNOLOGIE EXPLOITATION INFORMATIQUE.