dc2scale MRS1 (Marseille datacenter)
dc2scale MRS1 (Marseille datacenter) is an operational data center operated by dc2scale in Marseille, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | dc2scale |
| Networks | 5 networks PeeringDB. |
| Address | 15 rue Jacques Reattu |
| Coordinates | 43.24008, 5.39914 |
| Website | dc2scale.fr/our-datacenters/edge/marseille |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 1.6 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 2.8 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.2 °C (2001 to 2025) |
| Cooling degree days | 480 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is dc2scale MRS1 (Marseille datacenter) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 1.6 km away.
How clean is the power for dc2scale MRS1 (Marseille datacenter)?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates dc2scale MRS1 (Marseille datacenter)?
dc2scale.
Data centers near Marseille
- Marseille Nedelec 7.2 km
- Digital Realty Marseille MRS1/2/3/4 8.1 km · 25 MW
- PHOCEA DC-M1 8.2 km
- Marseille St-Mauront 8.6 km · 7 MW
- Datacenter Sud 10.7 km
- Verizon Marseille 11.3 km · 1.1 MW
- EXA Edge DC Marseille 11.7 km · 2.2 MW
- Digital Realty MRS3 11.8 km · 32 MW
More dc2scale data centers
- dc2scale PAR3 (Vélizy-Villacoublay) France
- dc2scale ALP1 (Grenoble) France
- dc2scale LIL1 (Lille Datacenter) France
- dc2scale Nanterre France
- dc2scale PAR4x (Meudon) France
- dc2scale PAR5 (Vélizy-Villacoublay) France
Sources
Correct this page or get the data