dc2scale PAR3 (Vélizy-Villacoublay)

dc2scale PAR3 (Vélizy-Villacoublay) is an operational data center operated by dc2scale in Vélizy-Villacoublay, France. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
Operatordc2scale
Facility power0.8 MW (range 0.4 MW to 1.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 627 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks11 networks
PeeringDB.
Also known asDC2SCALE Vélizy Latécoère
Address10 allée Latécoère
Coordinates48.78425, 2.20919
Websitedc2scale.fr

Power and grid

Nearest high-voltage substationRobinson, 225 kV, 3 km away (SNCF Réseau)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km19
Power plants within 50 km1.9 GW in 47 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days106 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does dc2scale PAR3 (Vélizy-Villacoublay) use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

How close is dc2scale PAR3 (Vélizy-Villacoublay) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Robinson (225 kV), about 3 km away.

How clean is the power for dc2scale PAR3 (Vélizy-Villacoublay)?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates dc2scale PAR3 (Vélizy-Villacoublay)?

dc2scale.

Data centers near Vélizy-Villacoublay

More dc2scale data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.