Cogent Paris 2

Cogent Paris 2 is an operational data center operated by Cogentco in Vélizy-Villacoublay, France. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCogentco
AddressRue Grange Dame Rose 16, 78140, Vélizy-Villacoublay
Coordinates48.78420, 2.20695
Websitecogentco.com/cogent-france

Power and grid

Nearest high-voltage substationRobinson, 225 kV, 3.1 km away (SNCF Réseau)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km18
Power plants within 50 km1.9 GW in 47 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days106 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Cogent Paris 2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Robinson (225 kV), about 3.1 km away.

How clean is the power for Cogent Paris 2?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Cogent Paris 2?

Cogentco.

Data centers near Vélizy-Villacoublay

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.