Data Center Directory

DC3-Oslo

DC3-Oslo is an operational data center operated by Green Mountain in Ytre Enebakk, Norway. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorGreen Mountain
Facility power13 MW (range 6.4 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,703 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asGreen Mountain Ytre Enebakk
AddressGranittvegen 110
Coordinates59.75820, 10.99450
Websitegreenmountain.no

Power and grid

Nearest high-voltage substationFollo trafostasjon, 420 kV, 12.3 km away (Statnett)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km77 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity28 g CO₂ per kWh (Norway, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99%
Industrial power priceEUR 0.097 per kWh (Norway, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.1 °C (2001 to 2025)
Cooling degree days22 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.55 kWh per m² per day
Wind at 50 m3.9 m/s average
Water stress todayLow (<10%) (Akershus)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DC3-Oslo use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is DC3-Oslo to the power grid?

The nearest high-voltage substation in OpenStreetMap is Follo trafostasjon (420 kV), about 12.3 km away.

How clean is the power for DC3-Oslo?

The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.

Who operates DC3-Oslo?

Green Mountain.

Data centers near Ytre Enebakk

More Green Mountain data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.