Digital Parks Africa
Digital Parks Africa is an operational data center in Midstream, South Africa. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.1 MW (range 0.9 MW to 5.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,711 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -25.92805, 28.15150 |
Power and grid
| Nearest high-voltage substation | Kosmosdal Substation, 132 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Minerva Substation, 400 kV, 7.2 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.4 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Parks Africa use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
How close is Digital Parks Africa to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kosmosdal Substation (132 kV), about 1.1 km away.
How clean is the power for Digital Parks Africa?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Data centers near Midstream
- Xneelo data center in Midrand 962 m · 4.2 MW
- xneelo JNB1 (Formerly Hetzner SA) 1.1 km · 4.3 MW
- NTT Data (MEA) - Johannesburg 1 Data Center (JOH1) 1.1 km
- Africa Data Centres, Johannesburg JHB2, South Africa 1.3 km · 12 MW
- NTT Johannesburg 1 Data Center (JOH1) 1.4 km · 2.5 MW
- Digital Parks - Samrand 1.9 km
- Vodacom data center in Midrand 5.7 km · 9.9 MW
- BCX data center in Midrand 6.0 km · 1.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.