NTT Johannesburg 1 Data Center (JOH1)
NTT Johannesburg 1 Data Center (JOH1) is an operational data center operated by NTT Global Data Centers in Centurion, South Africa. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 2.5 MW (range 1 MW to 6.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,602 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Also known as | NTT |
| Address | Corner Rietspruit and Sterling Road |
| Coordinates | -25.92066, 28.14055 |
| Website | datacenter.hello.global.ntt/en/location/johannesburg/johannesburg-1-data-center |
Power and grid
| Nearest high-voltage substation | Kosmosdal Substation, 132 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Minerva Substation, 400 kV, 6 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.4 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT Johannesburg 1 Data Center (JOH1) use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How close is NTT Johannesburg 1 Data Center (JOH1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kosmosdal Substation (132 kV), about 500 m away.
How clean is the power for NTT Johannesburg 1 Data Center (JOH1)?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates NTT Johannesburg 1 Data Center (JOH1)?
NTT Global Data Centers.
Data centers near Centurion
- NTT Data (MEA) - Johannesburg 1 Data Center (JOH1) 342 m
- Xneelo data center in Midrand 750 m · 4.2 MW
- xneelo JNB1 (Formerly Hetzner SA) 775 m · 4.3 MW
- Africa Data Centres, Johannesburg JHB2, South Africa 1.1 km · 12 MW
- Digital Parks Africa 1.4 km · 2.1 MW
- Digital Parks - Samrand 2.3 km
- ICTGlobe Centurion 6.1 km
- Vodacom data center in Midrand 6.2 km · 9.9 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.