Data Center Directory

NTT Johannesburg 1 Data Center (JOH1)

NTT Johannesburg 1 Data Center (JOH1) is an operational data center operated by NTT Global Data Centers in Centurion, South Africa. Our footprint estimate of its power is about 2.5 MW.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power2.5 MW (range 1 MW to 6.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,602 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks, 1 internet exchanges
PeeringDB.
Also known asNTT
AddressCorner Rietspruit and Sterling Road
Coordinates-25.92066, 28.14055
Websitedatacenter.hello.global.ntt/en/location/johannesburg/johannesburg-1-data-center

Power and grid

Nearest high-voltage substationKosmosdal Substation, 132 kV, 500 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMinerva Substation, 400 kV, 6 km away
HV substations within 10 km8
Power plants within 50 km1.4 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days588 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT Johannesburg 1 Data Center (JOH1) use?

We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.

How close is NTT Johannesburg 1 Data Center (JOH1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kosmosdal Substation (132 kV), about 500 m away.

How clean is the power for NTT Johannesburg 1 Data Center (JOH1)?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates NTT Johannesburg 1 Data Center (JOH1)?

NTT Global Data Centers.

Data centers near Centurion

More NTT Global Data Centers data centers

Sources

Correct this page or get the data