Xneelo data center in Midrand
Xneelo data center in Midrand is an operational data center operated by Xneelo in Midrand, South Africa. Our footprint estimate of its power is about 4.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Xneelo |
| Facility power | 4.2 MW (range 2.1 MW to 6.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,462 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -25.92729, 28.14193 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 6.2 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.4 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Xneelo data center in Midrand use?
We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.
How close is Xneelo data center in Midrand to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 800 m away.
How clean is the power for Xneelo data center in Midrand?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Xneelo data center in Midrand?
Xneelo.
Data centers near Midrand
- xneelo JNB1 (Formerly Hetzner SA) 123 m · 4.3 MW
- Africa Data Centres, Johannesburg JHB2, South Africa 504 m · 12 MW
- NTT Johannesburg 1 Data Center (JOH1) 750 m · 2.5 MW
- NTT Data (MEA) - Johannesburg 1 Data Center (JOH1) 766 m
- Digital Parks Africa 962 m · 2.1 MW
- Digital Parks - Samrand 2.5 km
- Vodacom data center in Midrand 5.5 km · 9.9 MW
- BCX data center in Midrand 5.7 km · 1.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.