Dynamics Mining
Dynamics Mining is an operational data center in Madisonville, United States. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.7 MW (range 1.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 39,553 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.36300, -87.54715 |
Power and grid
| Utility | Kenergy Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 769 g CO₂ per kWh (Kentucky, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 65.8%, gas 25.8%, hydro 5.3%, solar 2.4%, bioenergy 0.5%. Clean power: 8.2% |
| Industrial power price | USD 0.074 per kWh (Kentucky, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Kentucky) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Dynamics Mining use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Dynamics Mining?
The grid in Kentucky emits about 769 g CO₂ per kWh (2025). Largest sources: coal 65.8%, gas 25.8%, hydro 5.3%.
Data centers near Madisonville
- Energynet Datacenter 57.7 km
- Google Montgomery Data Center 85.6 km · 309 MW
- Google 85.9 km · 38 MW
- SPC4A 86.1 km · 38 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.