SPC4A
SPC4A is an operational data center operated by Google in Clarksville, United States. Our footprint estimate of its power is about 38 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 38 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,726 m² building outline x 2 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | SPC3A |
| Coordinates | 36.62406, -87.25691 |
Power and grid
| Utility | Cumberland Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | TVA |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 32.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SPC4A use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
What chips does SPC4A use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for SPC4A?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates SPC4A?
Google.
Data centers near Clarksville
- Google 395 m · 38 MW
- Google Montgomery Data Center 546 m · 309 MW
- Energynet Datacenter 31.0 km
- Russellvile EPB Smartnet 41.2 km
- Verizon Wireless 56.0 km · 2.8 MW
- Tennessee Processing Center LLC 62.1 km · 8.6 MW
- Level(3) Nashville (9th Ave) 63.1 km
- H5 Data Centers Nashville 66.8 km
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.