ekom21
ekom21 is an operational data center in Gießen, Germany. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.6 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,141 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Carlo-Mierendorff-Straße 11, 35398, Gießen |
| Coordinates | 50.59918, 8.66082 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 700 m away (Avacon Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 800 m away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 301 MW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 126 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ekom21 use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How close is ekom21 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 700 m away.
How clean is the power for ekom21?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Gießen
- 3U Rechenzentrum Marburg 22.6 km
- Artec data center in Bad Nauheim 27.9 km
- Earth Station Usingen 32.2 km
- Iron Mountain Data Center - Frankfurt (FRA-2) 44.8 km
- Keppel Data Centres | Keppel DC Frankfurt 1 44.9 km
- Kyndryl Data Center 45.5 km · 1.7 MW
- partimus Rechenzentrum Limburg 46.8 km
- OVHcloud LIM1-3 Rechenzentrum 47.3 km · 6.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.