Equinix
Equinix is an operational data center in Minoh, Japan. Our footprint estimate of its power is about 8.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.2 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,827 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.86052, 135.50808 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix use?
We estimate the facility power at about 8.2 MW. Estimate from building footprint, low confidence.
How clean is the power for Equinix?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Data centers near Minoh
- 西日本電話電信白島ビル 3.1 km · 0.6 MW
- SCSK株式会社 data center in Minoh 5.7 km
- NTT Kitahama Data Center(Dojima Campus) 13.9 km
- NTT 17.5 km
- NTT Sonezaki Data Center(Dojima Campus) 18.0 km
- TIS data center in Osaka 18.4 km
- NTT DATA Dojima (building #4) 18.4 km
- Digital Edge OSA1 - Osaka 18.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.