NTT Sonezaki Data Center(Dojima Campus)
NTT Sonezaki Data Center(Dojima Campus) is an operational data center operated by NTT Global Data Centers in Osaka-Shi Kita-Ku, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Networks | 20 networks, 4 internet exchanges PeeringDB. |
| Also known as | NTT |
| Address | 1-2-4 Sonezaki |
| Coordinates | 34.69857, 135.50322 |
| Website | global.nttsmc.com |
Power and grid
| Nearest high-voltage substation | 豊崎変電所, 154 kV, 2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 小曽根電力所, 275 kV, 6.6 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 6.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT Sonezaki Data Center(Dojima Campus) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 豊崎変電所 (154 kV), about 2 km away.
How clean is the power for NTT Sonezaki Data Center(Dojima Campus)?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT Sonezaki Data Center(Dojima Campus)?
NTT Global Data Centers.
Data centers near Osaka-Shi Kita-Ku
- TIS data center in Osaka 477 m
- NTT DATA Dojima (building #4) 1.2 km
- Osaka University SQUID 1.7 km · 0.3 MW
- NTT Docomo 2.3 km
- Digital Edge OSA1 - Osaka 2.6 km
- Equinix OS1 - Osaka 2.6 km
- KDDI data center in Osaka 2.9 km
- NTT DOCOMO BUSINESS OS4 - Osaka 3.0 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.