Osaka University SQUID
Osaka University SQUID is an operational AI data center operated by Osaka University in Osaka, Japan. Its power is about 0.3 MW. Epoch AI estimates about 106 H100-equivalent AI chips (NVIDIA A100 SXM4 80 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Osaka University |
| Facility power | 0.3 MW Reported (Epoch AI or owner data) |
| AI compute | 106 H100-equivalents |
| AI chips | NVIDIA A100 SXM4 80 GB Reported (Epoch AI or owner data) |
| Chip count | 336 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 120 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Osaka, Japan |
| Coordinates | 34.68359, 135.50078 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Osaka University SQUID | NVIDIA A100 SXM4 80 GB | 336 | 0.3 MW | 2021-05-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Osaka University SQUID use?
Public data puts the facility power at about 0.3 MW. Reported (Epoch AI or owner data).
What chips does Osaka University SQUID use?
Reported chips: NVIDIA A100 SXM4 80 GB.
How clean is the power for Osaka University SQUID?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Osaka University SQUID?
Osaka University.
Data centers near Osaka
- Equinix OS1 - Osaka 993 m
- NTT Docomo 1.3 km
- TIS data center in Osaka 1.3 km
- NTT DATA Dojima (building #4) 1.6 km
- NTT Sonezaki Data Center(Dojima Campus) 1.7 km
- NTT DOCOMO BUSINESS OS4 - Osaka 1.7 km
- Equinix OS3 - Osaka 1.8 km
- NTT Nipponbashi Data Center(Dojima Campus) 2.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.