Equinix OS3 - Osaka
Equinix OS3 - Osaka is an operational data center operated by Equinix in Osaka, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 23 networks, 4 internet exchanges PeeringDB. |
| Address | 2-2-82 Shiromi, Chuo-ku |
| Coordinates | 34.66980, 135.51033 |
| Website | equinix.com/data-centers/asia-pacific-colocation/japan-colocation/osaka-data-centers/os3 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Equinix OS3 - Osaka?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Equinix OS3 - Osaka?
Equinix.
Data centers near Osaka
- NTT DOCOMO BUSINESS OS4 - Osaka 448 m
- NTT Docomo 1.3 km
- NTT Nipponbashi Data Center(Dojima Campus) 1.4 km
- Equinix OS1 - Osaka 1.5 km
- Osaka University SQUID 1.8 km · 0.3 MW
- TIS data center in Osaka 3.0 km
- Digital Edge OSA1 - Osaka 3.2 km
- NTT Sonezaki Data Center(Dojima Campus) 3.3 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.