NTT Nipponbashi Data Center(Dojima Campus)
NTT Nipponbashi Data Center(Dojima Campus) is an operational data center operated by NTT Global Data Centers in Osaka, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Networks | 1 networks PeeringDB. |
| Address | 5-8-21 Nipponbashi, Naniwa-ku, Osaka-shi |
| Coordinates | 34.65769, 135.50607 |
| Website | global.nttsmc.com |
Power and grid
| Nearest high-voltage substation | 本田変電所 (Honden Substation), 154 kV, 3.4 km away (関西電力) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 小曽根電力所, 275 kV, 11.1 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 6.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT Nipponbashi Data Center(Dojima Campus) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 本田変電所 (Honden Substation) (154 kV), about 3.4 km away.
How clean is the power for NTT Nipponbashi Data Center(Dojima Campus)?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT Nipponbashi Data Center(Dojima Campus)?
NTT Global Data Centers.
Data centers near Osaka
- Equinix OS3 - Osaka 1.4 km
- NTT DOCOMO BUSINESS OS4 - Osaka 1.8 km
- Equinix OS1 - Osaka 2.2 km
- NTT Docomo 2.7 km
- Osaka University SQUID 2.9 km · 0.3 MW
- TIS data center in Osaka 4.3 km
- NTT DATA Dojima (building #4) 4.4 km
- NTT Sonezaki Data Center(Dojima Campus) 4.6 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.