Data Center Directory

NTT DOCOMO BUSINESS OS4 - Osaka

NTT DOCOMO BUSINESS OS4 - Osaka is an operational data center operated by NTT Global Data Centers in Osaka, Japan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Address1-3-30 Kawarayamachi, Chuo-ku
Coordinates34.67262, 135.51382
Websitentt.com/en/services/data-center/nexcenter.html

Power and grid

Nearest high-voltage substation本田変電所 (Honden Substation), 154 kV, 3.1 km away (関西電力)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation小曽根電力所, 275 kV, 9.6 km away
HV substations within 10 km11
Power plants within 50 km6.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature14.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.1 °C (2001 to 2025)
Cooling degree days712 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow - Medium (10-20%) (Osaka)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is NTT DOCOMO BUSINESS OS4 - Osaka to the power grid?

The nearest high-voltage substation in OpenStreetMap is 本田変電所 (Honden Substation) (154 kV), about 3.1 km away.

How clean is the power for NTT DOCOMO BUSINESS OS4 - Osaka?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates NTT DOCOMO BUSINESS OS4 - Osaka?

NTT Global Data Centers.

Data centers near Osaka

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.