Equinix OS1 - Osaka
Equinix OS1 - Osaka is an operational data center operated by Equinix in Osaka, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 71 networks, 5 internet exchanges PeeringDB. |
| Also known as | Secure Data Center Osaka |
| Address | 1-26-1 Shinmachi Nishi-ku |
| Coordinates | 34.67577, 135.49555 |
| Website | equinix.com/data-centers/asia-pacific-colocation/japan-colocation/osaka-data-centers/os1 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 154 kV, 1.4 km away (関西電力) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 8.9 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 6.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix OS1 - Osaka to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (154 kV), about 1.4 km away.
How clean is the power for Equinix OS1 - Osaka?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Equinix OS1 - Osaka?
Equinix.
Data centers near Osaka
- Osaka University SQUID 993 m · 0.3 MW
- Equinix OS3 - Osaka 1.5 km
- NTT DOCOMO BUSINESS OS4 - Osaka 1.7 km
- NTT Docomo 1.9 km
- NTT DATA Dojima (building #4) 2.2 km
- NTT Nipponbashi Data Center(Dojima Campus) 2.2 km
- TIS data center in Osaka 2.2 km
- NTT Sonezaki Data Center(Dojima Campus) 2.6 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.