NTT DATA Dojima (building #4)
NTT DATA Dojima (building #4) is an operational data center operated by NTT Global Data Centers in Osaka, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Networks | 50 networks, 4 internet exchanges PeeringDB. |
| Also known as | NTT DOCOMO BUSINESS OS3 - Osaka (Telepark Dojima Building 3) · NTT DOCOMO BUSINESS OS1 - Osaka (Telepark Dojima Building 1) · NTT Data Osaka Dojima |
| Address | NTT DATA Dojima Bldg, Dojima 3-1-21 kita-ku |
| Coordinates | 34.69542, 135.49108 |
| Website | nttdata.com |
Power and grid
| Nearest high-voltage substation | 本田変電所 (Honden Substation), 154 kV, 1.9 km away (関西電力) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 小曽根電力所, 275 kV, 6.7 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 6.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.1 °C (2001 to 2025) |
| Cooling degree days | 712 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Osaka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT DATA Dojima (building #4) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 本田変電所 (Honden Substation) (154 kV), about 1.9 km away.
How clean is the power for NTT DATA Dojima (building #4)?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT DATA Dojima (building #4)?
NTT Global Data Centers.
Data centers near Osaka
- TIS data center in Osaka 767 m
- NTT Sonezaki Data Center(Dojima Campus) 1.2 km
- Osaka University SQUID 1.6 km · 0.3 MW
- Equinix OS1 - Osaka 2.2 km
- NTT Docomo 2.7 km
- NTT DOCOMO BUSINESS OS4 - Osaka 3.3 km
- Equinix OS3 - Osaka 3.3 km
- Digital Edge OSA1 - Osaka 3.6 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.