Firmus data center in Newnham

Firmus data center in Newnham is an operational data center operated by Firmus in Newnham, Australia. Our footprint estimate of its power is about 25 MW.

Key facts

StatusOperational
OperatorFirmus
Facility power25 MW (range 10 MW to 62 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 207,762 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-41.15611, 146.92628

Power and grid

Nearest high-voltage substationGeorge Town Substation, 220 kV, 4.6 km away (TasNetworks)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km485 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature13.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature28.8 °C (2001 to 2025)
Cooling degree days35 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow (<10%) (Tasmania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Firmus data center in Newnham use?

We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.

How close is Firmus data center in Newnham to the power grid?

The nearest high-voltage substation in OpenStreetMap is George Town Substation (220 kV), about 4.6 km away.

How clean is the power for Firmus data center in Newnham?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Firmus data center in Newnham?

Firmus.