Firmus LST01 is an operational data center operated by Firmus in St Leonards, Australia. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Firmus |
| Facility power | 4.7 MW (range 2.3 MW to 7.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,899 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Address | 23 Killafaddy Road |
| Coordinates | -41.44044, 147.17536 |
| Website | firmus.co |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 200 m away (TasNetworks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 9.5 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 797 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.9 °C (2001 to 2025) |
| Cooling degree days | 64 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.18 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low (<10%) (Tasmania) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Firmus LST01 use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How close is Firmus LST01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 200 m away.
How clean is the power for Firmus LST01?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Firmus LST01?
Firmus.
Data centers near St Leonards
- Firmus data center in Newnham 37.8 km · 25 MW
More Firmus data centers
- Southgate Melbourne Australia
- Firmus data center in Devonport Australia
- Firmus data center in Newnham Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.