Free Pro - Datacenter Rock (LYO03)
Free Pro - Datacenter Rock (LYO03) is an operational data center operated by Free Pro (Ex. Jaguar Network - DCforDATA) in Lyon 08, France. Our footprint estimate of its power is about 7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Free Pro (Ex. Jaguar Network - DCforDATA) |
| Facility power | 7 MW (range 3.5 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,931 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.73858, 4.88987 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Vénissieux, 225 kV, 2.8 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 7.1 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 227 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.74 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Free Pro - Datacenter Rock (LYO03) use?
We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.
How close is Free Pro - Datacenter Rock (LYO03) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Vénissieux (225 kV), about 2.8 km away.
How clean is the power for Free Pro - Datacenter Rock (LYO03)?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Free Pro - Datacenter Rock (LYO03)?
Free Pro (Ex. Jaguar Network - DCforDATA).
Data centers near Lyon 08
- Free Pro - Lyon - Rock 196 m
- LASOTEL PIXEL 2.2 km
- UltraEdge Lyon-Venissieux 2.7 km · 4.2 MW
- Orange Lyon Lumière - Centrale 2.7 km · 53 MW
- Colt Lyon 2.8 km
- ETIX Lyon #1 3.7 km
- nLighten Lyon LYS1 4.0 km
- Euclyde DC5 4.0 km · 1.4 MW
More Free Pro (Ex. Jaguar Network - DCforDATA) data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.