Free Pro - Datacenter Rock (LYO03) is an operational data center operated by Free Pro (Ex. Jaguar Network - DCforDATA) in Lyon 08, France. Our footprint estimate of its power is about 7 MW.

Key facts

StatusOperational
OperatorFree Pro (Ex. Jaguar Network - DCforDATA)
Facility power7 MW (range 3.5 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,931 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates45.73858, 4.88987

Power and grid

Nearest high-voltage substationPoste électrique de Vénissieux, 225 kV, 2.8 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km12
Power plants within 50 km7.1 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days227 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.74 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Free Pro - Datacenter Rock (LYO03) use?

We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.

How close is Free Pro - Datacenter Rock (LYO03) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Vénissieux (225 kV), about 2.8 km away.

How clean is the power for Free Pro - Datacenter Rock (LYO03)?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Free Pro - Datacenter Rock (LYO03)?

Free Pro (Ex. Jaguar Network - DCforDATA).

Data centers near Lyon 08

More Free Pro (Ex. Jaguar Network - DCforDATA) data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.