Frontier (supercomputer)
Frontier (supercomputer) is an operational data center operated by Oak Ridge National Laboratory in Oak Ridge, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Oak Ridge National Laboratory |
| Coordinates | 35.92951, -84.31057 |
Power and grid
| Nearest gas pipeline | East Tennessee Gas Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
|---|---|
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 806 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.17 kWh per m² per day |
| Wind at 50 m | 3.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Frontier (supercomputer)?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates Frontier (supercomputer)?
Oak Ridge National Laboratory.
Data centers near Oak Ridge
- Oak Ridge NL Frontier 9.7 km · 40 MW
- LCUB Data Center 10.7 km
- Peace Communications KNX1 35.3 km
- CoreWeave Marble NC 90.2 km · 91 MW