Oak Ridge NL Frontier is an operational AI data center operated by US Department of Energy in Oak Ridge, United States. Its power is about 40 MW. Epoch AI estimates about 7,283 H100-equivalent AI chips (AMD Radeon Instinct MI250X).
Key facts
| Status | Operational |
|---|---|
| Operator | US Department of Energy |
| Facility power | 40 MW Reported (Epoch AI or owner data) |
| AI compute | 7,283 H100-equivalents |
| AI chips | AMD Radeon Instinct MI250X Reported (Epoch AI or owner data) |
| Chip count | 37,632 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Oak Ridge National Laboratory 5200, 1 Bethel Valley Rd, Oak Ridge, TN 37830 |
| Coordinates | 36.01029, -84.26957 |
Power and grid
| Utility | City Of Oak Ridge (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | TVA |
| Nearest gas pipeline | East Tennessee Gas Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 806 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.17 kWh per m² per day |
| Wind at 50 m | 3.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Oak Ridge NL Frontier | AMD Radeon Instinct MI250X | 37,632 | 40 MW | 2022-05-30 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oak Ridge NL Frontier use?
Public data puts the facility power at about 40 MW. Reported (Epoch AI or owner data).
What chips does Oak Ridge NL Frontier use?
Reported chips: AMD Radeon Instinct MI250X.
How clean is the power for Oak Ridge NL Frontier?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates Oak Ridge NL Frontier?
US Department of Energy.
Data centers near Oak Ridge
- Frontier (supercomputer) 9.7 km
- LCUB Data Center 18.8 km
- Peace Communications KNX1 31.7 km
More US Department of Energy data centers
- Argonne NL Aurora United States
- Lawrence Livermore NL El Capitan United States
- Lawrence Berkeley NL NERSC Perlmutter United States
- Los Alamos NL Venado United States
- Lawrence Livermore NL RZAdams United States
- Sandia NL El Dorado United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.