Lawrence Berkeley NL NERSC Perlmutter
Lawrence Berkeley NL NERSC Perlmutter is an operational AI data center operated by US Department of Energy in Berkeley, United States. Its power is about 6.9 MW. Epoch AI estimates about 2,260 H100-equivalent AI chips (NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | US Department of Energy |
| Facility power | 6.9 MW Reported (Epoch AI or owner data) |
| AI compute | 2,260 H100-equivalents |
| AI chips | NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB Reported (Epoch AI or owner data) |
| Chip count | 7,168 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lawrence Berkeley National Laboratory, Building 59, 1 Cyclotron Rd, Berkeley, CA 94720 |
| Coordinates | 37.87778, -122.24953 |
Power and grid
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.2 °C (2001 to 2025) |
| Cooling degree days | 487 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.23 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Lawrence Berkeley NL NERSC Perlmutter | NVIDIA A100 SXM4 40 GB + NVIDIA A100 SXM4 80 GB | 7,168 | 6.9 MW | 2021-05-17 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lawrence Berkeley NL NERSC Perlmutter use?
Public data puts the facility power at about 6.9 MW. Reported (Epoch AI or owner data).
What chips does Lawrence Berkeley NL NERSC Perlmutter use?
Reported chips: NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB.
How clean is the power for Lawrence Berkeley NL NERSC Perlmutter?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Lawrence Berkeley NL NERSC Perlmutter?
US Department of Energy.
Data centers near Berkeley
- Open Computing Facility 1.3 km
- Evocative Emeryville (EM1) 5.1 km
- Level(3) Oakland 5.8 km
- Digital Realty OAK (720 2nd St) 9.2 km · 20 MW
- Digital Realty SFO (365 Main) 15.9 km · 7.3 MW
- FedConnect San Francisco 16.3 km
- 274 Brannan Street 16.4 km
- TelePacific 16.8 km
More US Department of Energy data centers
- Argonne NL Aurora United States
- Oak Ridge NL Frontier United States
- Lawrence Livermore NL El Capitan United States
- Los Alamos NL Venado United States
- Lawrence Livermore NL RZAdams United States
- Sandia NL El Dorado United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.