Lawrence Livermore NL El Capitan
Lawrence Livermore NL El Capitan is an operational AI data center operated by US Department of Energy in Livermore, United States. Its power is about 35 MW. Epoch AI estimates about 44,000 H100-equivalent AI chips (NVIDIA V100, AMD Instinct MI300A).
Key facts
| Status | Operational |
|---|---|
| Operator | US Department of Energy |
| Facility power | 35 MW Reported (Epoch AI or owner data) |
| AI compute | 44,000 H100-equivalents |
| AI chips | NVIDIA V100, AMD Instinct MI300A Reported (Epoch AI or owner data) |
| Chip count | 44,544 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lawrence Livermore National Laboratory 7000 East Ave, Livermore, CA 94550 |
| Coordinates | 37.68202, -121.76837 |
Power and grid
| Nearest high-voltage substation | Las Positas Substation, 230 kV, 3.7 km away (Pacific Gas and Electric Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 2.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.2 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Lawrence Livermore NL Sierra | NVIDIA V100 | 17,280 | 12 MW | 2018-06-01 |
| Lawrence Livermore NL El Capitan Phase 1 | AMD Instinct MI300A | 512 | 0.8 MW | 2024-06-01 |
| Lawrence Livermore NL El Capitan Phase 2 | AMD Instinct MI300A | 44,544 | 35 MW | 2024-11-18 |
| Lawrence Livermore NL Tuolumne | AMD Instinct MI300A | 4,608 | 5.7 MW | 2024-11-18 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lawrence Livermore NL El Capitan use?
Public data puts the facility power at about 35 MW. Reported (Epoch AI or owner data).
What chips does Lawrence Livermore NL El Capitan use?
Reported chips: NVIDIA V100, AMD Instinct MI300A.
How close is Lawrence Livermore NL El Capitan to the power grid?
The nearest high-voltage substation in OpenStreetMap is Las Positas Substation (230 kV), about 3.7 km away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.
How clean is the power for Lawrence Livermore NL El Capitan?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Lawrence Livermore NL El Capitan?
US Department of Energy.
Data centers near Livermore
- Lawrence Livermore NL RZAdams 5.1 km · 2.1 MW
- QES Computers 12.1 km
- Petadata 23.6 km
- Hurricane Electric Fremont 1 25.7 km · 11 MW
- XO Fremont 26.7 km · 10 MW
- Hurricane Electric Fremont 2 26.9 km · 54 MW
- T5@SiliconValley 28.1 km
- Level(3) Hayward 32.2 km
More US Department of Energy data centers
- Argonne NL Aurora United States
- Oak Ridge NL Frontier United States
- Lawrence Berkeley NL NERSC Perlmutter United States
- Los Alamos NL Venado United States
- Lawrence Livermore NL RZAdams United States
- Sandia NL El Dorado United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.