T5@SiliconValley
T5@SiliconValley is an operational data center operated by T5 Data Centers in Newark, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Address | 39800 Eureka Dr |
| Coordinates | 37.51016, -122.00187 |
| Website | t5datacenters.com/locations/silicon-valley |
Power and grid
| Nearest high-voltage substation | Newark Substation, 230 kV, 1.7 km away (Pacific Gas and Electric Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is T5@SiliconValley to the power grid?
The nearest high-voltage substation in OpenStreetMap is Newark Substation (230 kV), about 1.7 km away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.
How clean is the power for T5@SiliconValley?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates T5@SiliconValley?
T5 Data Centers.
Data centers near Newark
- Petadata 5.1 km
- Hurricane Electric Fremont 1 6.6 km · 11 MW
- XO Fremont 8.0 km · 10 MW
- Hurricane Electric Fremont 2 8.4 km · 54 MW
- NASA Moffet Field 10.5 km
- Equinix SV4 - Silicon Valley, Sunnyvale 10.7 km · 17 MW
- Dell 350 Holger Way 11.4 km · 4.6 MW
- ServerFarm SC1 11.9 km · 5.1 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.