Hurricane Electric Fremont 2
Hurricane Electric Fremont 2 is an operational data center operated by Hurricane Electric in Fremont, United States. Our footprint estimate of its power is about 54 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Hurricane Electric |
| Facility power | 54 MW (range 27 MW to 87 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,589 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 303 networks, 13 internet exchanges PeeringDB. |
| Address | 48233 Warm Springs Blvd |
| Coordinates | 37.47181, -121.92011 |
| Website | he.net |
Power and grid
| Nearest high-voltage substation | Dixon Landing Substation, 115 kV, 1.6 km away (Pacific Gas and Electric Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Los Esteros Substation, 230 kV, 5.1 km away |
| HV substations within 10 km | 13 |
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.2 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hurricane Electric Fremont 2 use?
We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.
How close is Hurricane Electric Fremont 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dixon Landing Substation (115 kV), about 1.6 km away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.
How clean is the power for Hurricane Electric Fremont 2?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Hurricane Electric Fremont 2?
Hurricane Electric.
Data centers near Fremont
- XO Fremont 429 m · 10 MW
- Hurricane Electric Fremont 1 2.2 km · 11 MW
- Dell 350 Holger Way 6.3 km · 4.6 MW
- Coresite - Milpitas (SV2) 7.4 km · 14 MW
- NTT Global Data Centers data center in San Jose 8.0 km · 11 MW
- Stack Infrastructure 8.1 km · 8.2 MW
- Opus Interactive Silicon Valley (SJC01) 8.1 km · 13 MW
- ServerFarm SC1 8.2 km · 5.1 MW
More Hurricane Electric data centers
- Hurricane Electric Fremont 1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.