Hurricane Electric Fremont 1

Hurricane Electric Fremont 1 is an operational data center operated by Hurricane Electric in Fremont, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorHurricane Electric
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,385 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks40 networks, 3 internet exchanges
PeeringDB.
Address760 Mission Ct
Coordinates37.48988, -121.93101
Websitehe.net/colocation.html

Power and grid

Nearest high-voltage substationNUMMI Substation, 115 kV, 900 m away (Pacific Gas and Electric Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNewark Distribution Substation, 230 kV, 4.7 km away
HV substations within 10 km12
UtilityPacific Gas & Electric Co. (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineCalifornia Gas Transmission Co, intrastate pipeline, 1.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.2 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days370 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hurricane Electric Fremont 1 use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Hurricane Electric Fremont 1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is NUMMI Substation (115 kV), about 900 m away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.

How clean is the power for Hurricane Electric Fremont 1?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates Hurricane Electric Fremont 1?

Hurricane Electric.