XO Fremont
XO Fremont is an operational data center operated by XO in Milpitas, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | XO |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,536 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Warm Springs Boulevard 47913;47923;47963 |
| Coordinates | 37.47533, -121.92211 |
Power and grid
| Nearest high-voltage substation | Dixon Landing Substation, 115 kV, 2 km away (Pacific Gas and Electric Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Los Esteros Substation, 230 kV, 5.4 km away |
| HV substations within 10 km | 13 |
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.2 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does XO Fremont use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is XO Fremont to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dixon Landing Substation (115 kV), about 2 km away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.
How clean is the power for XO Fremont?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates XO Fremont?
XO.
Data centers near Milpitas
- Hurricane Electric Fremont 2 429 m · 54 MW
- Hurricane Electric Fremont 1 1.8 km · 11 MW
- Dell 350 Holger Way 6.6 km · 4.6 MW
- Coresite - Milpitas (SV2) 7.8 km · 14 MW
- T5@SiliconValley 8.0 km
- NTT Global Data Centers data center in San Jose 8.4 km · 11 MW
- Stack Infrastructure 8.5 km · 8.2 MW
- ServerFarm SC1 8.5 km · 5.1 MW
More XO data centers
- XO Nashville United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.