Lawrence Livermore NL RZAdams
Lawrence Livermore NL RZAdams is an operational AI data center operated by US Department of Energy in Livermore, United States. Its power is about 2.1 MW. Epoch AI estimates about 507 H100-equivalent AI chips (NVIDIA V100, Cerebras CS-1, AMD Instinct MI300A).
Key facts
| Status | Operational |
|---|---|
| Operator | US Department of Energy |
| Facility power | 2.1 MW Reported (Epoch AI or owner data) |
| AI compute | 507 H100-equivalents |
| AI chips | NVIDIA V100, Cerebras CS-1, AMD Instinct MI300A Reported (Epoch AI or owner data) |
| Chip count | 3,169 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 890 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 7000 East Ave, Livermore, CA 94550 |
| Coordinates | 37.68066, -121.70990 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Livermore Substation, 230 kV, 1.9 km away |
| HV substations within 10 km | 6 |
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.9 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 46.7 °C (2001 to 2025) |
| Cooling degree days | 871 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Lawrence Livermore NL Lassen Phase 1 | NVIDIA V100 | 2,736 | 1.9 MW | 2018-11-01 |
| Lawrence Livermore NL Lassen Phase 2 | NVIDIA V100 + Cerebras CS-1 | 3,169 | 2.1 MW | 2020-08-19 |
| Lawrence Livermore NL RZAdams | AMD Instinct MI300A | 512 | 0.8 MW | 2024-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lawrence Livermore NL RZAdams use?
Public data puts the facility power at about 2.1 MW. Reported (Epoch AI or owner data).
What chips does Lawrence Livermore NL RZAdams use?
Reported chips: NVIDIA V100, Cerebras CS-1, AMD Instinct MI300A.
How close is Lawrence Livermore NL RZAdams to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 500 m away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.
How clean is the power for Lawrence Livermore NL RZAdams?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Lawrence Livermore NL RZAdams?
US Department of Energy.
Data centers near Livermore
- Lawrence Livermore NL El Capitan 5.1 km · 35 MW
- QES Computers 17.2 km
- Petadata 27.8 km
- Hurricane Electric Fremont 1 28.8 km · 11 MW
- XO Fremont 29.5 km · 10 MW
- Hurricane Electric Fremont 2 29.7 km · 54 MW
- T5@SiliconValley 32.0 km
- NTT Global Data Centers data center in San Jose 34.6 km · 11 MW
More US Department of Energy data centers
- Argonne NL Aurora United States
- Oak Ridge NL Frontier United States
- Lawrence Livermore NL El Capitan United States
- Lawrence Berkeley NL NERSC Perlmutter United States
- Los Alamos NL Venado United States
- Sandia NL El Dorado United States
Sources
Correct this page or get the data