Los Alamos NL Venado

Los Alamos NL Venado is an operational AI data center operated by US Department of Energy in Los Alamos, United States. Its power is about 2.8 MW. Epoch AI estimates about 2,560 H100-equivalent AI chips (NVIDIA A100, NVIDIA GH200).

Key facts

StatusOperational
OperatorUS Department of Energy
Facility power2.8 MW
Reported (Epoch AI or owner data)
AI compute2,560 H100-equivalents
AI chipsNVIDIA A100, NVIDIA GH200
Reported (Epoch AI or owner data)
Chip count2,560
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLos Alamos, New Mexico, USA
Coordinates35.88146, -106.30178

Power and grid

Nearest high-voltage substationTA-03 Substation, 115 kV, 1.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorton Substation, 345 kV, 21.7 km away
HV substations within 10 km4
UtilityLos Alamos County (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPNM
Nearest gas pipelinePublic Service Co of NM, intrastate pipeline, 800 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km34 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity347 g CO₂ per kWh (New Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 35.7%, gas 26.4%, coal 20.5%, solar 17.4%. Clean power: 53.3%
Industrial power priceUSD 0.051 per kWh (New Mexico, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.8 °C (2001 to 2025)
Cooling degree days190 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.29 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (New Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Los Alamos NL ChicomaNVIDIA A1005120.4 MW2021-12-20
Los Alamos NL VenadoNVIDIA GH2002,5602.8 MW2024-04-16

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Los Alamos NL Venado use?

Public data puts the facility power at about 2.8 MW. Reported (Epoch AI or owner data).

What chips does Los Alamos NL Venado use?

Reported chips: NVIDIA A100, NVIDIA GH200.

How close is Los Alamos NL Venado to the power grid?

The nearest high-voltage substation in OpenStreetMap is TA-03 Substation (115 kV), about 1.7 km away. The local utility is Los Alamos County, in the PNM balancing area.

How clean is the power for Los Alamos NL Venado?

The grid in New Mexico emits about 347 g CO₂ per kWh (2025). Largest sources: wind 35.7%, gas 26.4%, coal 20.5%.

Who operates Los Alamos NL Venado?

US Department of Energy.

Data centers near Los Alamos

More US Department of Energy data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.