Data Center Directory

Sandia NL El Dorado

Sandia NL El Dorado is an operational AI data center operated by US Department of Energy in Albuquerque, United States. Its power is about 1.9 MW. Epoch AI estimates about 1,506 H100-equivalent AI chips (AMD Instinct MI300A).

Key facts

StatusOperational
OperatorUS Department of Energy
Facility power1.9 MW
Reported (Epoch AI or owner data)
AI compute1,506 H100-equivalents
AI chipsAMD Instinct MI300A
Reported (Epoch AI or owner data)
Chip count1,520
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 790 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAlbuquerque, New Mexico
Coordinates35.08819, -106.65094

Power and grid

Nearest high-voltage substationLomas Sub, 115 kV, 400 m away (Public Service Company of New Mexico)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWest Mesa Switching Station, 345 kV, 7.2 km away
HV substations within 10 km41
UtilityPublic Service Co Of Nm (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPNM
Nearest gas pipelinePublic Service Co of NM, intrastate pipeline, 3.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.8 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity347 g CO₂ per kWh (New Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 35.7%, gas 26.4%, coal 20.5%, solar 17.4%. Clean power: 53.3%
Industrial power priceUSD 0.051 per kWh (New Mexico, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days491 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.53 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayExtremely High (>80%) (New Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Sandia NL El DoradoAMD Instinct MI300A1,5201.9 MW2024-11-18

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Sandia NL El Dorado use?

Public data puts the facility power at about 1.9 MW. Reported (Epoch AI or owner data).

What chips does Sandia NL El Dorado use?

Reported chips: AMD Instinct MI300A.

How close is Sandia NL El Dorado to the power grid?

The nearest high-voltage substation in OpenStreetMap is Lomas Sub (115 kV), about 400 m away. The local utility is Public Service Co Of Nm, in the PNM balancing area.

How clean is the power for Sandia NL El Dorado?

The grid in New Mexico emits about 347 g CO₂ per kWh (2025). Largest sources: wind 35.7%, gas 26.4%, coal 20.5%.

Who operates Sandia NL El Dorado?

US Department of Energy.

Data centers near Albuquerque

More US Department of Energy data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.