Data Center Directory

LCUB Data Center

LCUB Data Center is an operational data center operated by Lenoir City Utilities Board in Lenoir City, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorLenoir City Utilities Board
Address7698 Creekwood Park Blvd
Coordinates35.84081, -84.26570
Websitelcub.com/data-center

Power and grid

Nearest high-voltage substationEaton Crossroads Substation, 161 kV, 600 m away (Knoxville Utilities Board)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRoane Substation, 500 kV, 16 km away
HV substations within 10 km4
UtilityCity Of Lenoir (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineEast Tennessee Gas Co, interstate pipeline, 3.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.3 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.7 °C (2001 to 2025)
Cooling degree days806 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.17 kWh per m² per day
Wind at 50 m3.8 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is LCUB Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Eaton Crossroads Substation (161 kV), about 600 m away. The local utility is City Of Lenoir, in the TVA balancing area.

How clean is the power for LCUB Data Center?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Who operates LCUB Data Center?

Lenoir City Utilities Board.

Data centers near Lenoir City

Sources

Correct this page or get the data