LCUB Data Center
LCUB Data Center is an operational data center operated by Lenoir City Utilities Board in Lenoir City, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lenoir City Utilities Board |
| Address | 7698 Creekwood Park Blvd |
| Coordinates | 35.84081, -84.26570 |
| Website | lcub.com/data-center |
Power and grid
| Nearest high-voltage substation | Eaton Crossroads Substation, 161 kV, 600 m away (Knoxville Utilities Board) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Roane Substation, 500 kV, 16 km away |
| HV substations within 10 km | 4 |
| Utility | City Of Lenoir (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | East Tennessee Gas Co, interstate pipeline, 3.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.3 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 806 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.17 kWh per m² per day |
| Wind at 50 m | 3.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is LCUB Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Eaton Crossroads Substation (161 kV), about 600 m away. The local utility is City Of Lenoir, in the TVA balancing area.
How clean is the power for LCUB Data Center?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates LCUB Data Center?
Lenoir City Utilities Board.
Data centers near Lenoir City
- Frontier (supercomputer) 10.7 km
- Oak Ridge NL Frontier 18.8 km · 40 MW
- Peace Communications KNX1 34.0 km
- CoreWeave Marble NC 79.6 km · 91 MW
Sources