Data Center Directory

Gigastream Oxford 1

Gigastream Oxford 1 is an operational data center operated by Gigastream in Oxford, United Kingdom. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorGigastream
Networks1 networks
PeeringDB.
AddressUnit 4, Oxford Business Centre, Osney Lane
Coordinates51.74914, -1.26816
Websitegigastream.co.uk

Power and grid

Nearest high-voltage substationWest Oxford Substation, 132 kV, 600 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCowley Substation, 400 kV, 6.8 km away
HV substations within 10 km7
Power plants within 50 km3.4 GW in 106 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days44 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Gigastream Oxford 1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is West Oxford Substation (132 kV), about 600 m away.

How clean is the power for Gigastream Oxford 1?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Gigastream Oxford 1?

Gigastream.

Data centers near Oxford

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.