Data Center Directory

CapitaLand Ascendas REIT data center in High Wycombe

CapitaLand Ascendas REIT data center in High Wycombe is an operational data center operated by CapitaLand Ascendas REIT in High Wycombe, United Kingdom. Our footprint estimate of its power is about 3.8 MW.

Key facts

StatusOperational
OperatorCapitaLand Ascendas REIT
Facility power3.8 MW (range 1.9 MW to 6.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,181 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCoronation Road, HP12 3TA, High Wycombe
Coordinates51.61990, -0.77903
Websitecapitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/cressex-businesspark.html

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationAmersham Main, 400 kV, 9.9 km away
HV substations within 10 km2
Power plants within 50 km3.6 GW in 108 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days44 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CapitaLand Ascendas REIT data center in High Wycombe use?

We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.

How close is CapitaLand Ascendas REIT data center in High Wycombe to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 300 m away.

How clean is the power for CapitaLand Ascendas REIT data center in High Wycombe?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates CapitaLand Ascendas REIT data center in High Wycombe?

CapitaLand Ascendas REIT.

Data centers near High Wycombe

More CapitaLand Ascendas REIT data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.