CapitaLand Ascendas REIT data center in High Wycombe
CapitaLand Ascendas REIT data center in High Wycombe is an operational data center operated by CapitaLand Ascendas REIT in High Wycombe, United Kingdom. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CapitaLand Ascendas REIT |
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,181 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Coronation Road, HP12 3TA, High Wycombe |
| Coordinates | 51.61990, -0.77903 |
| Website | capitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/cressex-businesspark.html |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Amersham Main, 400 kV, 9.9 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 3.6 GW in 108 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CapitaLand Ascendas REIT data center in High Wycombe use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is CapitaLand Ascendas REIT data center in High Wycombe to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 300 m away.
How clean is the power for CapitaLand Ascendas REIT data center in High Wycombe?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates CapitaLand Ascendas REIT data center in High Wycombe?
CapitaLand Ascendas REIT.
Data centers near High Wycombe
- iomart DC5 Maidenhead 10.8 km · 2.6 MW
- Pulsant Maidenhead SE-2 14.2 km · 1 MW
- Virgin Media O2 Slough 14.4 km · 8.4 MW
- Equinix LD6 - London, Slough 14.4 km · 4.6 MW
- Equinix LD7 - London, Slough 14.5 km · 15 MW
- Iron Mountain Data Center - London (LON-1) 14.5 km · 28 MW
- Equinix LD4 - London, Slough 14.6 km · 11 MW
- CyrusOne London 3 14.8 km · 7 MW
More CapitaLand Ascendas REIT data centers
- The Chess Building United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.