Data Center Directory

CyrusOne London 3

CyrusOne London 3 is an operational data center operated by CyrusOne in Slough, United Kingdom. Our footprint estimate of its power is about 7 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power7 MW (range 3.5 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,853 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asCyrusOne LON3
Address700 Stirling Rd
Coordinates51.52598, -0.62699
Websitecyrusone.com/locations/united-kingdom/london-three

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 200 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationIver Substation, 400 kV, 9.1 km away
HV substations within 10 km12
Power plants within 50 km3.8 GW in 97 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne London 3 use?

We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.

How close is CyrusOne London 3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 200 m away.

How clean is the power for CyrusOne London 3?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates CyrusOne London 3?

CyrusOne.

Data centers near Slough

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.