Equinix LD10 - London, Slough is an operational data center operated by Equinix in Slough, United Kingdom. Our footprint estimate of its power is about 2.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 2.9 MW (range 1.2 MW to 7.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,046 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 21 networks, 5 internet exchanges PeeringDB. |
| Also known as | Equinix LD10 |
| Address | 13 Liverpool Road |
| Coordinates | 51.52204, -0.62374 |
| Website | equinix.com/locations/united-kingdom-colocation/london-data-centers/ld10 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Iver Substation, 400 kV, 9 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 3.8 GW in 96 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix LD10 - London, Slough use?
We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.
How close is Equinix LD10 - London, Slough to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 200 m away.
How clean is the power for Equinix LD10 - London, Slough?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Equinix LD10 - London, Slough?
Equinix.
Data centers near Slough
- CyrusOne London 1 112 m · 8.6 MW
- VIRTUS LONDON4 (Slough) 153 m
- VIRTUS London 4 187 m · 19 MW
- Iron Mountain LON-2 227 m · 12 MW
- Equinix LD5 - London, Slough 371 m · 21 MW
- VIRTUS London 11 385 m · 7.2 MW
- China Mobile International - London DC 408 m · 7.5 MW
- Rackspace Slough 418 m · 5.8 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.