GLB2

GLB2 is an operational data center operated by green.ch in Opfikon, Switzerland. Our footprint estimate of its power is about 6.1 MW.

Key facts

StatusOperational
Operatorgreen.ch
Facility power6.1 MW (range 3.1 MW to 9.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,100 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.43271, 8.55868

Power and grid

Grid carbon intensity39 g CO₂ per kWh (Switzerland, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.5 °C (2001 to 2025)
Cooling degree days117 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.4 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow (<10%) (Switzerland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does GLB2 use?

We estimate the facility power at about 6.1 MW. Estimate from building footprint, low confidence.

How clean is the power for GLB2?

The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.

Who operates GLB2?

green.ch.